• About Us
  • Privacy Policy
  • Terms of Use
  • Breaking News
  • Explainers
  • Listen Live
Tuesday, June 23, 2026
Citinewsroom - Comprehensive News in Ghana
Advertisement
  • Home
  • News
    • Regional News
      • Ahafo Region
      • Ashanti Region
      • Bono East Region
      • Bono Region
      • Central Region
      • Eastern Region
      • Greater Accra Region
      • Northern Region
      • North East Region
      • Oti Region
      • Savanna Region
      • Upper East Region
      • Upper West Region
      • Volta Region
      • Western Region
      • Western North Region
  • Sports
    • World Cup
  • Politics
  • Business
  • Entertainment
  • Articles
  • Explainers
  • Editorials
No Result
View All Result
Citinewsroom - Comprehensive News in Ghana
  • Home
  • News
    • Regional News
      • Ahafo Region
      • Ashanti Region
      • Bono East Region
      • Bono Region
      • Central Region
      • Eastern Region
      • Greater Accra Region
      • Northern Region
      • North East Region
      • Oti Region
      • Savanna Region
      • Upper East Region
      • Upper West Region
      • Volta Region
      • Western Region
      • Western North Region
  • Sports
    • World Cup
  • Politics
  • Business
  • Entertainment
  • Articles
  • Explainers
  • Editorials
No Result
View All Result
Citinewsroom - Comprehensive News in Ghana
No Result
View All Result

Lack of dynamism from GRIDCo contributed to power cuts – Mutawakilu

Delali Adogla-BessabyDelali Adogla-Bessa
March 8, 2021
Reading Time: 1 min read
ShareShareShareShare

A former Ranking Member on Parliament’s select committee on Mines and Energy, Adam Mutawakilu, says the Ghana Grid Company’s (GRIDCo) inability to adjust its system in response to power supply challenges in the Western Region led to the mass power cuts yesterday.

In an interview with Citi Business News, Mr. Mutawakilu highlighted the need for a dynamic system to effectively respond to such challenges, as well as the need for a constant supply of fuel to emergency plants to enable them supply power in times of such challenges.

“Whenever there is this fault in generation, there is the need for other generating plants to come on board. When this thing happened, there was the need to quickly cut off some areas so that the load balance will be there,” he explained.

The former Damongo Member of Parliament also blamed the situation on financial challenges in the energy sector.

“Do we have fuel down so that most of the plants that are there can easily be brought on board? I don’t think currently we have fuel to do that and that brings up the financial challenges in the energy sector,” he said.

A challenge in GRIDCo’s power system led to a total system shutdown and total power outage nationwide on Sunday, March 7, 2021.

This affected the Bulk Supply Points (BPSs) in the country.

The power challenges happened a little after 2 pm on Sunday.

GRIDCo has since explained that the total power system shutdown experienced on Sunday was due to a technical fault on one of the major transmission lines between Prestea and Obuasi.

“This situation led to overloads on other adjacent transmission lines, leading to a sequence of trips and an eventual power system shutdown in the country,” GRIDCo said in a statement.

Tags: GRIDCoPower cuts
ShareTweetSendSend
Previous Post

Absa Deputy CEO, Peter Matlare dies after battling COVID-19

Next Post

Sections of N1, N2 and N4 highway to be closed down for repair of transmission lines

Related Posts

Football

2026 World Cup: PURC, ECG, GRIDCo roll out measures to ensure stable power supply

June 11, 2026
Featured

Insulation failure caused Akosombo GRIDCo substation fire – Report

June 11, 2026
The board of GRIDCo with the Speaker
Featured

GRIDCo Board calls on Bagbin, seeks stronger ties on energy push

June 6, 2026
Featured

GRIDCo to undertake emergency maintenance works at Tema substation

May 26, 2026
Minister for Energy and Green Transition, John Abdulai Jinapor, with GRIDCo officials
Business

GRIDCo fire: Temporary control room to be ready by September — Jinapor

May 20, 2026
General

GRIDCo Board holds staff durbar, pledges operational excellence

May 11, 2026
Next Post

Sections of N1, N2 and N4 highway to be closed down for repair of transmission lines

ADVERTISEMENT
Citinewsroom - Comprehensive News in Ghana

CitiNewsroom.com is Ghana's leading news website that delivers high quality innovative, alternative news that challenges the status quo.

Archives

Download App

Download

Download

  • About Us
  • Privacy Policy
  • Terms of Use
  • Breaking News
  • Explainers
  • Listen Live

© 2024 All Rights Reserved Citi Newsroom.

No Result
View All Result
  • Home
  • News
    • Regional News
      • Ahafo Region
      • Ashanti Region
      • Bono East Region
      • Bono Region
      • Central Region
      • Eastern Region
      • Greater Accra Region
      • Northern Region
      • North East Region
      • Oti Region
      • Savanna Region
      • Upper East Region
      • Upper West Region
      • Volta Region
      • Western Region
      • Western North Region
  • Sports
    • World Cup
  • Politics
  • Business
  • Entertainment
  • Articles
  • Explainers
  • Editorials

© 2024 All Rights Reserved Citi Newsroom.